Arenas

Pictured below is a regulation English dressage arena nestled in the oaks.  No trees were removed for this arena.  Size and allowable slope were surveyed, vegetation removed and re-compacted just like a building pad.  Crushed limestone road base processed with water and rolled.  Topsoil and grass that were stripped was utilized in the slopes around the arena.

 

  Subgrade

  Road base complete

  Back filled

  Finished

  Shallow water diversion cut on uphill side to keep hillside run off out of arena.